Integration project and Budget.

Materials
Quantity
Price
Subtotal
Servomotor
1
$150.00
$150.00
Motor
1
$280.00
$280.00
Wood
1 (2x1.20mtrs)
$190.00
$63.00
Insulating
1,5mtrs
$56.00
$79.00
Glass
1 (50x50cms)
$190.00
$190.00
Vinyl paper type mirror
1mtrs
$96.00
$96.00
Galvanised Steel
1
$50.00
$50.00
Bearings
2
$170.00
$240.00
Aluminum bar
1
$190.00
$190.00
Operational amplifier
1
$12.00
$12.00
Perico
1
$40.00
$40.00
Aluminum angle
8mtrs
$75.00
$150.00
Bicycle chain
1
$50.00
$50.00
Wheels
4
$22.00
$88.00




Total.


$1678.00




















The work of this quarter was the construction of the prototype of solar furnace which will help in the different tasks were welding, cutting timber, providing building ideas besides analyzing the construction of the prototype, the team this quarter was joined by coordinating the team since we split the work to expedite the construction of the furnace, in this part my greatest contribution was the development of the progress report also began to experiment with the control circuit tracking the sun to the database engine.
In conclusion teamwork it was important as previous research on furnaces and chef needs when using the oven and proper use of materials.

viernes, 9 de octubre de 2015

oral presentation


Labelled Diagram

























Specification Chart

























                                   Description Of The Project